Site visits

SITE VISIT 1

A full day visit to the Olkaria Geothermal Field will provide the experience to view the Olkaria 1 unit IV & V power plant at East Field and the installations generating 140MW commissioned in February 2015. In addition to a relaxing lunch at the Geothermal Spa located in the Hells Gate National Park you will also visit and be briefed on the latest technology in action including the, wellhead generator unit, discharging well and a working drilling rig. 

Delegates will see:

- Wellhead Generator Unit – a mobile power plant enabling early generation from single wells before construction of large power plants

- Discharging Well – a well which has been assembled and opened for the flow test to characterize its reservoir parameters including its power output

- Working Drilling Rig – KenGen’s 2000 HP electric land rig that has a capacity to drill wells up to a depth of 7,000m.

SITE VISIT 2

To be confirmed

For more information please do not hesitate to send us an email at future-energy@spintelligent.com or call us on +27 21 700 3500

Book your seat today!